HYDROSTATIC LEVEL MEASUREMENT[email protected]
≋SubmersibleLevelPROBES · CABLES · INTEGRATION
Menu

05 / SALINE & COASTAL WATER / SLV-TI

Titanium Submersible Level Transmitters for Seawater & Brine

Specify a titanium wetted assembly for saline tanks, coastal monitoring and compatible brine duties, starting with actual chemistry and temperature.

Titanium body target · complete wetted-material review

Titanium wetted-assembly and saline installation review; not a released assembly
Original engineering concept. Final dimensions and construction are defined by the configured drawing.

Seawater tanks, desalination feed and saline groundwater

A titanium body is only one part of the corrosion decision.

No universal seawater lifetime, marine-class approval or corrosion warranty follows from the family name. Review galvanic contact and the entire immersed assembly.

Define the configuration before the quotation

  • Grade 2 titanium and other grades are distinct requests; confirm the selected alloy, diaphragm and every seal.
  • Request 1–300 m liquid-head spans with 4–20 mA, HART or RS485; qualify the actual combination.
  • Include salinity, dissolved contaminants, cleaning chemicals, temperature and the immersion period.

THREE INPUTS THAT MAKE THE REVIEW USEFUL

Bring the installation into the specification.

01

Salinity, chloride content and cleaning chemistry

02

Maximum liquid head, density and temperature

03

All wetted metals, seals, cable jacket and support fittings

SPECIFY THE CONFIGURED ASSEMBLY

Range, materials and cable requirements for SLV-TI.

Selection itemRequest / optionRelease check
Alloy and wet partsGrade 2 titanium body request; other alloys separatelyConfirm the material schedule, diaphragm, seals and any wetted fasteners.
Salinity and exposureActual salinity / chloride content and immersion durationReview cleaning chemistry, temperature, deposits and galvanic contacts.
Liquid-head spanRequest 1–300 m; actual SG basisQuoted range, overload and immersion rating must match the chosen assembly.
Signal and cable4–20 mA, HART or RS485; qualified PUR / FEPApprove jacket and termination for the actual medium and route.
EvidenceMaterial identification, calibration and configured drawingNo marine approval or fixed corrosion lifetime is claimed.

Separate normal seawater from concentrated or contaminated brine; a generic salinity label is insufficient.

Use measured density at operating temperature to avoid treating every saline liquid as SG 1.025.

Review stainless suspension hardware and other contacting metals alongside the titanium probe.

Selection brief, not an issued manufacturing drawing, serial calibration certificate or blanket product approval. Confirm the exact release documents with the quotation.

INDEPENDENT TECHNICAL REFERENCES

Read the reference alongside its limits.

Independent reference: STS lists titanium as a material option for its own PTM/N/SDI-12. That documents a market construction option, not corrosion qualification or availability of an SLV assembly.

Third-party names identify independent sources. No affiliation, supplied-equipment approval or performance equivalence is claimed. Reviewed 17 November 2026.

READ THE INSTALLATION BEFORE THE SIGNAL

Keep a dry atmospheric reference and a stable sensor datum.

A fixed probe reads the liquid column above its diaphragm. Cable length covers the physical route to a dry termination. Neither a pipe-size label nor an image establishes the assembly dimensions.

Download installation & loop-load worksheet ↓
Conceptual atmospheric tank probe and two-wire loop; no released dimensions
Original installation concept. Two-wire loop example; digital interfaces and approved barrier circuits require their own drawings. Verify wiring, load and installation details against the configured assembly.

CONFIGURE YOUR PROBE & TERMINATION

One complete specification.
One clear quote request.

Set liquid head, density, signal and the installed cable route. The configuration code carries these choices into your engineering request.

ENQUIRY CONFIGURATION CODEComplete the measuring range
Indicative allowance per probe kit$84Probe, freight and tax excluded. Length prices apply to a matched base assembly; no generic first-5m FEP upgrade is free.

This code requests a configuration; the written quotation defines released dimensions, materials, approvals and availability.

Include this configuration in my RFQ ↗
Engineering accessories — indicative per probe kit

Bellows and desiccant options need a compatible compensation/vent design. Surge ratings, clamp load and controller functions are confirmed for the selected assembly.

Place the ordinary 316 stainless suspension clamp in a suitable dry location above the splash zone; separately qualify immersed or saline-exposed mounting hardware.

START WITH YOUR INSTALLATION

Four operating environments, four different selection decisions.

Chemical dosing tanks →

Specify chemical submersible probes from concentration, temperature, complete wetted materials and actual liquid density.

Generator fuel tanks →

Define low-head diesel tank measurement with fuel blend, usable level, cable route, area classification and generator input.

Groundwater & telemetry →

Plan groundwater pressure span, deployment cable, surveyed datum and low-power logger integration for borehole networks.

Lift stations & CSO →

Select a wastewater hydrostatic probe around rags, grease, turbulence, cleaning access, vent protection and pump-control acceptance.

KEEP THE WHOLE LOOP IN VIEW

From probe selection to dry cable termination.

Before you specify SLV-TI

Is this a released stock model?

SLV-TI identifies an enquiry configuration family. Ask for the exact configured datasheet, materials, drawing and calibration acceptance criteria before placing an order.

Can I order cable length independently from range?

Yes, specify both independently. Cable must cover the installed route and service allowance; measuring range covers liquid head above the probe. The quote confirms maximum immersion and cable load.

START WITH THE INSTALLATION

Liquid. Depth. Cable. Signal.

Send these four inputs to start a configuration review.

Request an engineering quote ↗