$58 allowance
Vented desiccant junction box
A serviceable atmospheric breather and replaceable desiccant help manage vent moisture. Confirm IP66 target rating for the complete enclosure and install above flood level.
SUBMERSIBLELEVEL / ENGINEERING SUPPORT
Specify vented PUR/FEP cable, a serviceable desiccant breather junction box, strain-relief hanger and compatible tank level indicator.
$58 allowance
A serviceable atmospheric breather and replaceable desiccant help manage vent moisture. Confirm IP66 target rating for the complete enclosure and install above flood level.
$26 allowance
Relieve suspended cable weight without loading electrical conductors or crushing the vent tube. Confirm cable diameter and load rating.
$145 allowance
Review input signal, supply, relay logic and engineering units. Volume display requires tank geometry; pump protection requires installation-specific design.
PUR/PE additional-length allowances: 10/20/50/100/200m are +$12/$35/$90/$185/$370. FEP: 10/20/30/50m are +$28/$78/$128/$225 relative to its matched 5m base assembly. A FEP upgrade to another base assembly is quoted separately; custom lengths need review.
For longer runs, submit actual installation depth, routing, service loop, required tensile capacity and signal type. Do not equate maximum liquid head with total cable length.
REFERENCE CONSTRUCTION & INSTALLATION DETAILS


CONFIGURE YOUR PROBE & TERMINATION
Set liquid head, density, signal and the installed cable route. The configuration code carries these choices into your engineering request.
This code requests a configuration; the written quotation defines released dimensions, materials, approvals and availability.
Include this configuration in my RFQ ↗KEEP THE WHOLE LOOP IN VIEW