HYDROSTATIC LEVEL MEASUREMENT[email protected]
≋SubmersibleLevelPROBES · CABLES · INTEGRATION
Menu

SUBMERSIBLELEVEL / ENGINEERING SUPPORT

Hydrostatic Probe Datasheets, Selection & Wiring Resources

Download open SLV family selection briefs and installation / inspection worksheets. Request the configured dimensions, CAD and unit records with your quote.

OPEN DOWNLOADS — NO REGISTRATION

Bring a defined configuration to the engineering review.

SLV-TI selection brief

Selection table, installation checks and the information needed to release the configured assembly.

Download PDF ↓

SLV-EX selection brief

Selection table, installation checks and the information needed to release the configured assembly.

Download PDF ↓

SLV-SDI selection brief

Selection table, installation checks and the information needed to release the configured assembly.

Download PDF ↓

SLV-HT selection brief

Selection table, installation checks and the information needed to release the configured assembly.

Download PDF ↓

SLV-420 selection brief

Selection table, installation checks and the information needed to release the configured assembly.

Download PDF ↓

SLV-WW selection brief

Selection table, installation checks and the information needed to release the configured assembly.

Download PDF ↓

SLV-PTFE selection brief

Selection table, installation checks and the information needed to release the configured assembly.

Download PDF ↓

SLV-BH16 selection brief

Selection table, installation checks and the information needed to release the configured assembly.

Download PDF ↓

Vented installation & wiring

Datum, vent, strain relief, loop-load arithmetic and approval checkpoints.

Download PDF ↓

Five-point inspection worksheet

Blank inspection fields and calculated 4–20mA reference points. A worksheet, not measured calibration evidence.

Download PDF ↓

Review the two-wire 4–20mA loop with the actual electronics.

CheckMethodBoundary
Positive loopDC supply + → transmitter +Use only the configured pinout / wire colours.
Return loopTransmitter − → PLC current input +; PLC return → supply −Isolated inputs, barriers and local grounding can change the topology.
Load budgetR_available = (V_supply − V_sensor_min − V_other_drops) / I_maxThen subtract fixed series resistance; if negative, the proposed supply is insufficient.
Worked arithmetic24V, 12V sensor minimum, 2V other drops, 20mA → 500Ω availableExample assumptions only, not a rating for every SLV assembly.
Hazardous areasApproved probe, barrier, cable and control drawing as one reviewed circuitNo generic diagram conveys intrinsic-safety approval.

Released drawings and unit records follow the selected configuration.

Use the selection brief to define the assembly. Request its actual 2D dimensions in mm/inches, STEP availability, configured pinout, calibration record and required material/approval documents in the RFQ. This resource center does not substitute a blank worksheet for an issued certificate or publish invented CAD.

Request configured release documents ↗