07 / LOW-POWER FIELD MONITORING / SLV-SDI
SDI-12 & Modbus Groundwater Telemetry Level Sensors
Define a hydrostatic level and temperature measurement for a battery or solar logger, with the actual protocol, sampling cycle and energy budget.
SDI-12 / RS485 options · level and temperature targets
Groundwater networks, remote wells and solar telemetry
Choose the logger interface and measure the whole duty cycle.
SDI-12 and RS485 Modbus require different electrical interfaces and software. A digital output does not by itself establish low consumption, battery life or telemetry connectivity.
Define the configuration before the quotation
- Request 3.5–200 m head spans, level plus temperature and the exact SDI-12 commands or Modbus register map.
- Supply voltage, sleep current, active current, warm-up and sample time need model-specific evidence; no universal 3.3 V compatibility is assumed.
- For SGMA-related projects, define the monitoring plan, datum, records and agency requirements; a probe alone does not establish compliance.
THREE INPUTS THAT MAKE THE REVIEW USEFUL
Bring the installation into the specification.
Sample interval, warm-up time and power budget
Casing clearance, sensor datum and installation depth
SPECIFY THE CONFIGURED ASSEMBLY
Range, materials and cable requirements for SLV-SDI.
| Selection item | Request / option | Release check |
|---|---|---|
| Span and channels | Request 3.5–200 m head plus temperature | Confirm pressure reference, accuracy basis, channel order and units. |
| Protocol | SDI-12 or RS485 Modbus as separate configurations | Require supported commands / registers, address, baud/parity and logger compatibility. |
| Energy | Request sleep/active current, warm-up and measurement duration | Use actual supply voltage and complete measurement cycle; no battery-life guarantee. |
| Installation | Casing ID, datum, deployment, surface route and service loop | Liquid-head span does not size the cable or qualify maximum submergence. |
| Data quality | Manual reference readings, timestamp and acceptance plan | SGMA or other monitoring obligations belong to the site program, not a product badge. |
Keep the atmospheric vent dry; a low-power logger does not correct a blocked reference tube.
Long SDI-12 cables require topology, capacitance, voltage-drop and logger testing; the standard allows longer runs with fewer sensors. Include the full cycle in energy budgets.
Request a logger integration test and a recorded reference water-level check before network deployment.
Selection brief, not an issued manufacturing drawing, serial calibration certificate or blanket product approval. Confirm the exact release documents with the quotation.
INDEPENDENT TECHNICAL REFERENCES
Read the reference alongside its limits.
The SDI-12 Support Group defines the interface and protocol. STS provides an independent example of a level/temperature implementation. Neither reference establishes our supply limits, measured current, command set or battery life.
Third-party names identify independent sources. No affiliation, supplied-equipment approval or performance equivalence is claimed. Reviewed 17 November 2026.
READ THE INSTALLATION BEFORE THE SIGNAL
Keep a dry atmospheric reference and a stable sensor datum.
A fixed probe reads the liquid column above its diaphragm. Cable length covers the physical route to a dry termination. Neither a pipe-size label nor an image establishes the assembly dimensions.
Download installation & loop-load worksheet ↓CONFIGURE YOUR PROBE & TERMINATION
One complete specification.
One clear quote request.
Set liquid head, density, signal and the installed cable route. The configuration code carries these choices into your engineering request.
This code requests a configuration; the written quotation defines released dimensions, materials, approvals and availability.
Include this configuration in my RFQ ↗START WITH YOUR INSTALLATION
Four operating environments, four different selection decisions.
Chemical dosing tanks →
Specify chemical submersible probes from concentration, temperature, complete wetted materials and actual liquid density.
Generator fuel tanks →
Define low-head diesel tank measurement with fuel blend, usable level, cable route, area classification and generator input.
Groundwater & telemetry →
Plan groundwater pressure span, deployment cable, surveyed datum and low-power logger integration for borehole networks.
Lift stations & CSO →
Select a wastewater hydrostatic probe around rags, grease, turbulence, cleaning access, vent protection and pump-control acceptance.
KEEP THE WHOLE LOOP IN VIEW
From probe selection to dry cable termination.
Before you specify SLV-SDI
Is this a released stock model?
SLV-SDI identifies an enquiry configuration family. Ask for the exact configured datasheet, materials, drawing and calibration acceptance criteria before placing an order.
Can I order cable length independently from range?
Yes, specify both independently. Cable must cover the installed route and service allowance; measuring range covers liquid head above the probe. The quote confirms maximum immersion and cable load.
START WITH THE INSTALLATION
Liquid. Depth. Cable. Signal.
Send these four inputs to start a configuration review.